CAPABILITY

Every milestone from PO to port, verifiable

Lead time, factory audits, minimum order, packing and freight, after-sales — the five questions overseas buyers ask first, answered on one page.

1,000 m² showroom
1,000 m² showroomShowroom on the production site
10,000+ ㎡Manufacturing base
100+ mSmart production line
15–25 dayslead time, standard build
1 unitminimum order
SIX CAPABILITIES

Six things to verify before ordering

Each of these can be checked on site during a factory visit — no marketing claims required.

01

Capacity & production line

A 10,000+ m² manufacturing base with a 100+ m production line. A digital management system covers testing, quality, assembly and final inspection, and every process step is traceable.

02

Lead time

Standard configurations ship in 15–25 days. Custom finishes, special voltages and bulk orders are confirmed against the production schedule, with a firm sailing date agreed before signing.

03

Minimum order

One unit is enough to start — no batch threshold. Accessories and consumables can be consolidated in the same container for a first trial order.

04

Factory audit & samples

A 1,000 m² showroom sits on the same site as the production line, with the full range on display. Visiting buyers can operate machines on the spot, review original certificates and walk the assembly and testing areas.

05

Export packing & shipping

Export-grade wooden cases protect against humidity and shock on long sea routes. Case dimensions, gross and net weight, and 20GP / 40HQ loading quantities are provided for freight calculation.

06

After-sales & spare parts

Installation and operation manuals ship with every unit. On-site commissioning and operator training can be included and are written into the contract. Spare parts carry model-level part numbers with long-term supply, and remote troubleshooting is available for overseas customers.

DELIVERY PROCESS

Six milestones from inquiry to installation

Inquiry & selection

Inquiry & selection

We confirm clinic conditions, chair count and procedures, then propose a configuration

Quotation & contract

Quotation & contract

Pricing follows configuration, quantity and delivery terms, with lead time written into the contract

Scheduling & production

Scheduling & production

The order enters the schedule, with progress reported at key process milestones

Testing

Testing

Every unit is powered up for safety and function tests, with records shipped alongside

Packing & shipping

Packing & shipping

Export wooden cases, then full-container loading straight to port

Arrival & installation

Arrival & installation

Compliance documents ship with the equipment so customs clearance and installation can start on arrival

FAQ

Lead time and minimum order

How long does one unit take?

Standard units ship in 15–25 days. Custom finishes or voltages are confirmed against the production schedule, with a sailing date agreed before signing.

What is the MOQ? Can I start with one unit?

One unit. There is no batch threshold, and accessories can be consolidated in the same container.

Can I audit the factory?

Yes, at any time by appointment. The showroom and production line share one site, the full range is on display, and original certificates can be reviewed on site.

Is installation and training included?

Installation, commissioning and operator training can be included; the exact scope is written into the contract or delivery list.

NEXT STEP

Need a specific lead time and configuration?

Tell us your clinic type, chair count and destination port, and we will quote against your actual conditions.

WhatsApp AIAsesor de selección